Home / For Brands & Chains

One pilot store. Then forty more, identical.

Rollout programs for jewelry brands and retail chains—one factory, one program manager, one standard from the pilot store to the last handover.

Pilot store & golden sample before any batch runs

Batches aligned to your opening calendar

3-year warranty – spare parts SLA

WHAT WE COMMIT TO — IN WRITING

In the contract, not the brochure.

98% · 2024-25

On-time handover, per store

Each store gets its own delivery window, agreed at spec freeze. We hit 98% of windows across 2024–25 programs — and flag the other 2% weeks ahead, not days.

GOLDEN-SAMPLE CONTROLLED

Finish match across batches

Every batch is checked against your signed golden sample — color, gloss, grain, lighting tone — before it leaves the line.

ONE POINT OF CONTACT

One program manager

A single owner across all stores and time zones. One WhatsApp group, one weekly report, no-explaining.

72H DISPATCH SLA

3-year warranty + spare parts

Structural warranty on every case. Replacement glass and finish parts dispatched within 72 hours of sign-off — for the life of the program.

THE PROGRAM

How a rollout runs.

01

Store survey & brief

All ten sites measured; the agency’s concept book engineered into one shop-drawing library.

02

Pilot store & golden sample

We build one store and a signed-off finish sample. Nothing batches until you approve both.

03

Spec freeze

Drawings, finishes and packaging locked in a version-controlled library. Every later store builds from the same files.

04

Batched production


Stores grouped into batches matched to your opening dates — with a QC photo report per store, not per order.

05

Per-store kitting & delivery

Each store ships as its own labeled kit — cases, hardware, spares — DDP to the door on its agreed window.

06

Install & after-sales

Install drawings and remote support for your shopfitters. Spare parts on call for three years.

REPLICATION CONTROL

Same case, every time.

A customer walking from your Paris store to your London store should not be able to tell the cases apart. That is the whole discipline of a rollout — and it is measured, not promised.

CONTROL

STANDARD

Golden sample

Kept in QC lab, program life

Color match

ΔE ≤ 1 vs. master finish board

Repeat-cabinet tolerance

±1 mm on critical dimensions

Batch verification

Photo + measurement report, every store

[ GOLDEN SAMPLE RACK, QC LAB ]

Your golden sample lives in our QC lab for the life of the program. Every batch is signed off against it — not against memory.

YOUR PROGRAM TEAM

Three people own your program. By name.

Full capability index

[ PROGRAM MANAGER ]

PROGRAM MANAGER

Your single point of contact — owns the calendar, the WhatsApp group and the weekly report.

[ ACCOUNT ENGINEER ]

ACCOUNT ENGINEER

Turns your concept book into shop drawings and keeps the spec library current through every change request.

[ QC LEAD ]

QC LEAD

Signs every batch against the golden sample before it crates. Their name is on the report.

ROLLOUT LOGISTICS

Ten cities is a schedule, not a problem.

Staggered containers

Batches ship as they finish — matched to store opening dates, not when the whole program is done.

Per-store kits

Every store’s cases, hardware and spares crated together, labeled by store — nothing to sort on arrival.

DDP to each door

Customs, duties and last-mile delivery handled per store, across 70+ countries. No import paperwork here.

Spares ride along

A spare glass panel and finish kit ships inside every store’s crate — most fixes never need the factory.

WARRANTY & AFTER-SALES

After the last store opens, we’re still on call.

The biggest risk in a rollout isn’t one store — it’s store thirty, two years in, with a scratched panel and no one answering. Our after-sales terms are written into the program contract.

Locking systems

Cam, cylinder & electronic

72 h

Spare parts dispatched after sign-off, air freight if urgent

3 yrs

Finish parts and glass held in stock for your program

24 h

Response SLA on any after-sales ticket, in writing

PROOF, NOT PROMISES

We’ve run this play before.

[ PILOT STORE INSTALL ]

CASE STUDY · RETAIL CHAIN · NORTH AMERICA

Ten stores across Canada, one golden sample.

10 Stores · 92 Cabinets · 100% on-time handovers · 2024-25

Read the case study

FREE DOWNLOAD

The Rollout Planning Pack.

Still comparing suppliers or building the internal case? Start with the documents we use to run real programs:

Store survey checklist — what to measure before anyone quotes

Rollout timeline template, pilot to final handover

Spec-freeze checklist — what to lock before batch one

A real per-store QC report (anonymized)

Get the pack by email

    I agree that EBEKEA stores my email to send the catalog and follow up once (GDPR). No newsletters - privacy notice.

    MULTI-STORE PROGRAMS

    Bring us your opening calendar.

    Tell us where the stores are and when they open. An engineer and program manager reply within 24 hours with a feasibility read and program quote.

    Plan a rolloutBook a 20-min video call

    Or

    WhatsApp us

    — usually replies within the hour